Date Range
Date Range
Date Range
Material for 2010 US Particle Accelerator School - San Francisco. Intermediate Accelerator Physics - Beam Manipulation and Control. Course Outline and Beam Diagnostics 1. Transverse Optics Measurement and Correction. Transverse Optics Measurement and Correction.
He experimental study was completed at the end of 2004 and by the end of 2005 a scheme to implement this novel approach in the PS machine was defined and its performance assessed. The MTE Project has the mandate to implement and to commission the new extraction scheme. August 1st 2008, first MTE extraction.
Material for 2010 US Particle Accelerator School - San Francisco. Intermediate Accelerator Physics - Beam Manipulation and Control. Course Outline and Beam Diagnostics 1. Transverse Optics Measurement and Correction. Transverse Optics Measurement and Correction.
The I-LHC Project has been completed successfully and first LHC runs have taken place. These pages are not updated any more, but are kept as reference as they contain general information on the project and minutes of meetings. With LHC related aspects and issues limiting the performance during ion operation and,. The complete LHC ion injector chain from the source to the SPS and including accumulation in LEIR as central part.